An entity claiming to have started work prior to the establishment of PNGRB must have spent 25 per cent of the investment earmarked in the detailed feasibility report.
Plant rating 4000 tpd* Operated 1986 to 1994 Gold Recovery 93.6% Silver Recovery 67.6%
An entity claiming to have started work prior to the establishment of PNGRB must have spent 25 per cent of the investment earmarked in the detailed feasibility report.
September 18, 2024
Endurance Gold (TSXV: EDG) has announced preliminary assay results from its initial six diamond drill holes at the Reliance gold project in southern British Columbia. This drilling, said Endurance, focused on the Imperial and Diplomat zones within a 2-km long … Read More
September 18, 2024
Electra Battery Materials (NASDAQ: ELBM; TSXV: ELBM) has launched the Aki Battery Recycling joint venture with Indigenous economic development firm Three Fires Group to find critical minerals in scrap. The effort is focused on selling black mass, made by recyc … Read More
September 18, 2024
Botswana has granted Giyani Metals (TSXV:EMM) a 15-year mining license for the Kgwakwe Hill (K.Hill) project, positioning the company to become the country’s first producer of battery-grade manganese. K.Hill is a near-surface manganese oxide deposit located ab … Read More
Freddy Dodge and Juan Ibarra & looking for new mines to rescue!
Freddy Dodge and Juan Ibarra & looking for new mines to rescue!
The Supply mine with over 750000 tons of material on the ground for processing,
The Supply mine with over 750000 tons of material on the ground for processing,
Yukon. New 10 year license, 30 claims grouped. 30 Virgin Claims.