The Global Resource For Connecting Buyers and Sellers

Salazar Cuts 16.60 Metres (15.60m True) Averaging 3.66 g/t Gold, 117.40 g/t Silver, 4.88% Copper, 5.36% Zinc Northeast of the El Domo Deposit at Its Curipamba Project

VANCOUVER, BRITISH COLUMBIA–(Marketwired – May 15, 2017) – Salazar Resources Limited (TSX VENTURE:SRL)(FRANKFURT:CCG) (“Salazar” or the “Company”) is pleased to report results from the additional six holes (1,888 meters) of the phase V diamond drill program in progress on the Company’s 100-per-cent owned (21,500 ha) Curipamba volcanogenic massive sulphide (VMS) project in Ecuador. These holes represent new exploratory drilling and were not included in the latest El Domo resource estimate which was released on January 16th, 2015.