- Santana Minerals (ASX: SMI) has reported 26.9 metres at 13.0 grams per tonne gold at its Rise and Shine deposit in New Zealand, adding evidence of…
Santana Minerals (ASX: SMI) has reported 26.9 metres at 13.0 grams per tonne gold at its Rise and Shine deposit in New Zealand, adding evidence of high-grade continuity within an area targeted for the proposed operation’s early open-pit mining sequence.
The intersection in hole MDD537 began at a downhole depth of 152.3 metres and had a reported true width of 24.9 metres. It was accompanied by 34.4 metres at 8.8 g/t gold from 160.7 metres in MDD536, with a true width of 30.6 metres, according to the company’s latest drilling announcement.
The significance lies less in identifying a new mineralised zone than in testing how consistently an already recognised high-grade domain holds together. Santana’s infill programme targets HG1, where greater geological confidence could help translate exploration results into more reliable early-stage mine scheduling.
Broad Intersections Put HG1’s Geometry in Focus
The reported programme comprises 16 holes totalling 3,503 metres and reduces drill spacing in the targeted area from approximately 25 metres to 21 metres. That is a focused tightening of an existing drill pattern, rather than a broad exploration campaign across untested ground.
Other results provide additional tests of the mineralised zone. MDD535 returned 17 metres at 5.9 g/t gold from 176 metres, with a reported true width of 14.6 metres. A separate interval in the same hole delivered 8.5 metres at 4.2 g/t from 198 metres, equivalent to a true width of 7.3 metres.
MDD534B intersected 10.2 metres at 10.1 g/t gold from 175.8 metres, with a true width of 8.9 metres. A second interval returned 14.4 metres at 3.3 g/t from 189.7 metres, with a true width of 12.9 metres.
The distinction between downhole length and true width matters. A drill hole can cross mineralisation obliquely, making its reported intersection longer than the thickness of the mineralised body. Santana’s true-width estimates indicate that the headline results represent substantial thicknesses, although those dimensions alone don’t establish the volume or grade of a mineable block.
The separate intervals in MDD535 and MDD534B also shouldn’t be treated as single continuous intersections. Their differing grades and intervening gaps are relevant to how mineralised material and waste might eventually be separated in a mining model.
Earlier Drilling Sets a High Bar for the Latest Results
Santana had already reported substantial high-grade intersections at Rise and Shine before this update. Earlier infill drilling included 41.6 metres at 8.6 g/t gold from 164.4 metres in MDD326. Another previously reported hole, MDD528, returned 24.4 metres at 10.9 g/t from 165.7 metres, alongside a separate two-metre interval grading 89.5 g/t.
Those results establish an important comparison. MDD537’s 13.0 g/t interval is higher grade than the broad intersections cited from MDD326 and MDD528, but MDD326 carried mineralisation over a longer reported downhole interval. No single comparison establishes that the deposit’s overall grade has increased.
The useful question is whether closely spaced holes support a repeatable geological interpretation. High grades in isolated samples can have limited planning value if their distribution remains uncertain. Broad intersections across additional holes may help constrain that uncertainty, subject to their location, orientation and incorporation into the resource model.
On that basis, the latest assays are better understood as evidence supporting HG1’s continuity than as a fresh discovery or a demonstrated resource expansion.
Early Mining Confidence Is the Next Practical Test
Santana’s 2025 annual-report material described a proposed operation producing more than 1.2 million ounces over an initial 13.8-year mine life, combining open-pit and underground mining centred primarily on Rise and Shine. Those figures describe the wider development proposal, not production attributable to the latest drill results.
Within that framework, HG1’s position in the planned early open-pit sequence gives the infill work particular relevance. Better definition of early mining areas could improve estimates of ore availability and feed grade when an operation would be establishing its production rhythm. It doesn’t, by itself, demonstrate lower costs or stronger project economics.
For New Zealand’s prospective gold-development pipeline, the practical issue is whether established mineralisation can be converted into a sufficiently dependable mining inventory. These results address part of that task, rather than resolving the broader development requirements.
Santana says infill drilling is continuing. In the coming months, the more consequential test will be how the additional assays affect geological interpretation and mine planning, particularly whether HG1’s modelled grades and boundaries remain consistent as the drill pattern tightens.
Mining news, straight to your inbox
Market moves, deals and new listings. No spam, unsubscribe anytime.







