A patented system is for sale or joint venture, designed for black sand concentrated materials. The main processing unit (reactor) holds a 2 yard charge. The ore is oxidized with on-site generated chemicals within the closed loop reactor system. The dissolved precious metal ions are dropped out or captured on ionic resin and reduced to a precious metal. The overall time between charges varies between 24 and 72 hours depending on the mineral makeup of the ore. The equipment and spare part inventories are to massive to list here. This is a complete, operational processing system that puts refined 99.7% pure Au, PGM precious metals in your hand.
Check us out: www.trilogyrefining.com, email georgemeyer49@gmail.com
Please use the form below to contact the seller about this equipment: