Work covering the Taylor Prospect:
1929-1935 work preformed by Hawkins Mining Syndicate included a stripping, trenching and a 2,000 lbs bulk sample that uncovered 7 quartz veins one running 30.5 g/t Au over 0.30 metres and 5.1 g/t Au from test pit.
1935 Hollinger Gold Mines diamond drilling intersected 31.31 g/t Au over 6.1 metres.
Work covering the Shenango Prospect:
1935 to 1937 work preformed by Shenango Mining Co. included Trenching (1000 ft.), channel sampling, exploration shaft (52 ft.deep), adit (90 ft.), open cut mining, diamond drilling (2500 ft.) Assays average 0.140 oz./ton over 5 ft. wide and 400 ft. of strike length.
1937-1941 work preformed by Shenango Mining Co. included diamond drilling (400 ft.), trenching, production shaft (135 ft.) Reported assay results underground; 0.14 oz./ton over 30 ft., 0.18 oz./ton over 20 ft. 0.22 oz./ton over 15 ft. 0.17 oz./ton over 8 ft.
1945 work preformed by Shenango Mining Co. included clean up operation at mill. Results reported were recovery of 35.87 ounces of gold and 5 ounces of silver.
1979-1981 work preformed by St. Josephs Exploration Ltd. work included ground geophysics, I.P., geological mapping and sampling. Results reported that samples taken from muck pile returned assays of: 7.54 g/t, 6.69 g/t, 52.4 g/t Au