Gold miner Orinoco Gold has completed a low capital cost process plant modification at its Cascavel gold mine, in Brazil, resulting in a 500 t trial parcel of low-grade ore being produced.
The modification included the replacement of screen deck panels with smaller aperture panels, as well as the fabrication and installation of a sluice box. In addition, primary and secondary crusher jaw gaps were reduced.












