NexGen Energy Ltd. (TSXV:NXE, OTCQX:NXGEF) announced the first results from our highly anticipated 30,000 m winter 2016 drilling program on our 100% owned Rook I Property, Athabasca Basin, Saskatchewan.
Highlights include:
Highlights:
A2 Shear:
- AR-16-64c2 (30 m up-dip and northeast from AR-15-44b) intersected 76.0 m of total composite mineralization including 26.15 m of total composite off-scale radioactivity (10,000 – >61,000 cps) within a 165.5 m section (414.0 to 579.5 m) including 5.5 m of composite radioactivity measuring a minimum of >61,000 cps in the Sub-Zone.
- AR-16-64c1 (21 m up-dip and southwest from AR-15-49c2) intersected 74.0 m of total composite mineralization including 14.0 m of total composite off-scale radioactivity (10,000 – >61,000 cps) within a 100.0 m section (433.5 to 533.5 m) in the Sub-Zone.
Table 1: Higher Grade A2 Sub-Zone Drill Hole Comparisons
AR-15-
59c22AR-15-
54c12AR-15-
58c12AR-16-
63c1AR-15-
621AR-15-
44b2AR-16-
64c2AR-16-
64c1AR-15-
49c22AR-15-
57c32Total composite mineralization =
75.50 m
42.00 m
86.00 m
55.50 m
143.00 m
135.60 m
76.00 m
74.0 m
73.50 m
62.50 m
Total Off-scale (>10,000 to 29,999 cps)3 =
11.40 m
5.90 m
14.30 m
6.85 m
17.75 m
30.25 m
15.95 m
10.30 m
15.70 m
4.40 m
Total Off-scale (>30,000 to 60,999 cps)3 =
4.50 m
3.00 m
3.85 m
0.50 m
10.60 m
7.75 m
4.70 m
3.70 m
5.20 m
2.50 m
Total Off-scale (>61,000 cps)3 =
1.00 m
0.50 m
2.00 m
0.00 m
2.00 m
1.50 m
5.50 m
0.00 m
2.15 m
1.80 m
Continuous GT (Grade x Thickness) =
371
277
200 and
345Assays
Pending787
655
Assays
PendingAssays
Pending605
319
1 radioactivity results previously released
2radioactivity and assays results previously released
3 minimum radioactivity using RS-120 gamma spectrometer
.
These first radioactivity results of the winter program are simply exceptional. They highlight the continuity of the higher grade A2 sub-zone, established by substantial massive to semi-massive pitchblende, and consistent true width. Hole AR-16-64c2 has a similar radioactivity profile to AR-15-49c2 (returned continuous GT of 605), except it has more than double the minimum >61,000 cps of 5.5m. Further, the results in the A3 are very exciting with respect to defining the higher grade zones within this shear.
The post NexGen Reports First Results from Winter 2016 Drilling Program appeared first on Investing News Network.