Pino Alto Underground Silver Mine
A rich silver-lead-zinc proven mine in Mexico
Summary
We will be mining a large lead-zinc-silver, sulfide vein system with an average grade of 900g silver, 12.2% lead, 4.4% zinc per tonne. The mine contains a minimum of 250,000 tonnes, enough for 34 years of mining at 25 tonnes per day. Annual projected net profit, after tax, is at least $2.5m USD. We are looking for $35,000 - $100,000 USD for 1-3% share in the company, with 0.5% the minimum investment.
We are ready to put the mine into production as soon as we get the funding. In 2-4 weeks of receiving the funding we can be mining the vein, and dividends start 1-2 months after.
Looking for Similar Properties?
Browse our marketplace for active mining properties in similar locations or with similar commodities.
Browse All Listings